Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
AHTAYU nouveau quartier à usage mixte – B4 Design & Engineering

AHTAYU nouveau quartier à usage mixte

Yangon , Myanmar

|

2016

Villes Nouvelles & Extensions Urbaines

Projet

Dans le cadre du développement Est de la Métropole de Rangoon, NPC a missionné le cabinet d’architectes Spiral et B4 Design & Engineering pour étudier un concept de quartier à usage mixte combinant développement industriels, bureaux et logement, et leur apporter une assistance technique pendant la phase d’approbation du projet par les autorités.​


Périmètre de réflexion

55 ha​


nos missions

APS | Avant projet sommaire

Etudes préliminaires

  • Diagnostic du site
  • Analyse des contraintes et du risque d’inondation
  • Avant projet des infrastructures urbaines (Nivellement, Voirie, AEP, EP, EU, Elec (MT-BT), Telecom, VDI, Eclairage public)
  • Estimation des coûts de construction​

Concepteur

Spiral Architect​


Client

Confidentiel



Plan vue d'ensemble