Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
KM127 Éco-Resort – B4 Design & Engineering

KM127 Éco-Resort

Normandie , France

|

2016

Tourisme & Resorts

Projet

KM127 est un projet de ressort hôtelier de luxe développé en Normandie dans une approche écoresponsable. B4 Design & Engineering a participé aux études sur les infrastructures urbaines dans une approche globale en apportant une attention particulière sur :​

  • l’insertion du projet dans son site. ​
  • une gestion « à la parcelle » du cycle de l’eau.

Périmètre de réflexion

15 ha, Surface de plancher bâtiment: 10 000m² (construction neuve bâtiment)​


nos missions

AMO sur expertise technique VRDAssistance à Maîtrise d’Ouvrage sur expertise su Voiries et Réseaux Divers

  • AMO sur expertise technique VRD
  • Etudes préliminaires des infrastructures (VRD)
  • Pilotage et coordination des études tout corps d’état ​

Approche Développement Durable & Resiliente,
Objectif bâtiment autonome, gestion intégrée des eaux pluviales (cycle de l’eau)​


Concepteur

Mégard Architects / Batisphere


Client

KM GROUP​


©Mégard Architectes


©Mégard Architectes