Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Route Nationale 16 – B4 Design & Engineering

Route Nationale 16

Gao, Mali

|

2021 – 2022

Infrastructures VRD

Projet

Requalification de la RN16 entre Douentza et Gao


Périmètre de réflexion

369km de RN 16 + 448km de pistes rurales​


nos missions

Diagnostic |

Etudes préliminaires

  • Après une expertise des études APD antérieures, réalisation d’un diagnostic de terrain avec relevé des dysfonctionnements chaussées et hydrauliques.​
  • Elaboration d’un projet réhabilitation des ouvrages hydrauliques en technique sans tranchées par gainage et tubage​
  • Proposition d’une stratégie de requalification phasée. / Etude sur la voirie comprenant la géométrie viaire et les structures de chaussées adaptées / Quantitatif estimatif avec bordereau des prix détaillant les interventions VRD par variante et par zone​


Client

Banque Mondiale​