Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Projet BOTANY – Construction de 30 logements – B4 Design & Engineering

Projet BOTANY – Construction de 30 logements

Corbas, France

|

2022

Infrastructures VRD

Projet

Ce projet consiste à construire un bâtiment de 30 logements sur deux niveaux de sous-sol. Le site se trouve dans la commune de Corbas. ​


Périmètre de réflexion

1 500m²​


nos missions

DCE | Dossier de consultation des entreprises

PROEtudes de projet

  • Etudes des raccordements des bâtiments aux réseaux d’eaux pluviales et d’eaux usées existants et projetés
  • Etude de nivellement des plateformes bâtiments
  • Etude sur la voirie comprenant la géométrie viaire et les structures de chaussées adaptées
  • Quantitatif estimatif avec bordereau des prix détaillant les interventions VRD par bâtiment.​


Concepteur

Archigroup


Client

URBAT