Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Bâtiment LINK_ZAC des Girondins – B4 Design & Engineering

Bâtiment LINK_ZAC des Girondins

Lyon, France

|

2016

Infrastructures VRD

Projet

Le projet porte sur l’aménagement de l’îlot 17 de la ZAC des Girondins avec un programme mixte de bureaux et de logements. Ce projet est réalisé par BOUYGUES IMMOBILIER, EGIS en assure la conception et la synthèse technique lors des travaux.


Périmètre de réflexion

23 000 m², VRD autour du nouveau bâtiment


nos missions

Phase travaux : synthèse des réseaux

  • Etudes des raccordements du bâtiment aux réseaux existants et projetés dans le cadre de la ZAC
  • Analyse du dossier d’études préliminaires
  • Appui auprès des concessionnaires et gestionnaires de réseaux pour proposer des solutions techniques de raccordements et leur validation ​

Concepteur

Petitdidier Prioux / Egis​


Client

Bouygues Immobilier​