Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
CREM Competition: EVEREST Site Extension – B4 Design & Engineering

CREM Competition: EVEREST Site Extension

-, France

|

2020 – 2021

VRD Infrastructure

Project

The project involves creating a new office building within an existing site with the overhaul of all external networks (Roads, Utilities, and Earthworks). Demathieu & Bard commissioned B4 Design & Engineering to carry out the Preliminary Design Studies for Roads, Networks, and Earthworks for the CREM competition.


Scope of Reflection

17 000m²


our missions

AVPPreliminary Design

  • Study of connections from the buildings to the existing and projected stormwater and wastewater networks
  • Survey of building platform leveling
  • Road study including road geometry and adapted pavement structures
  • Detailed estimate with a price list detailing the Civil Engineering works per building.

Designer

Architecture Studio / Demathieu & Bard​


Client

MINARM