Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Logizone – B4 Design & Engineering

Logizone

Casablanca , Morocco

|

2018

Industrial & Commercial Zones

Project

The project involves the design and construction of a state-of-the-art logistics park in an area with complex topography.


Scope of Reflection

5 ha


our missions

AVP | Preliminary Design

PRODevelopment Design

Detailed technical studies:

  • Leveling and earthworks
  • Stormwater runoff and drainage
  • Traffic and urban road studies
  • Urban networks
  • Construction cost estimation

Designer

Arabany Architecte​


Client

ARMIX