Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Construction de 13 bâtiments – B4 Design & Engineering

Construction de 13 bâtiments

Bourg-en-Bresse, France

|

2021

Infrastructures VRD

Projet

Le projet consiste à créer 13 bâtiments en R+2 à R+3 sans sous-sol, ainsi que des parkings, des voiries et des espaces verts.​


Périmètre de réflexion

260 000 m²


nos missions

AVPAvant-projet

Etudes des raccordements des bâtiments aux réseaux d’eaux pluviales et d’eaux usées existants et projetés / Etude de nivellement des plateformes bâtiments / Etude sur la voirie comprenant la géométrie viaire et les structures de chaussées adaptées / Quantitatif estimatif avec bordereau des prix détaillant les interventions VRD par bâtiment.​


Concepteur


Client

URBAT