Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Management of drinking water in the Eastern neighborhoods of Freetown – B4 Design & Engineering

Management of drinking water in the Eastern neighborhoods of Freetown

Freetown, Sierra Leone​

|

2019 – En cours

Urban hydraulics

Project

The Ministry of Water Resources of Sierra Leone has initiated a project to build a drinking water supply network from the water source (Rockel River) to distribution in the eastern neighborhoods of Freetown. B4 Design & Engineering is part of the consortium selected to conduct feasibility and preliminary studies for the water conveyance and treatment system.


Capacity

100 000 m3/jours ​


our missions

Project Management

Coordination of technical studies.


Designer

AWSE / Montmasson / EY Consulting / International Office of Water​


Client

Ministery Of Water Ressources ​


Vue de Freetown