Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Foshan Railway Station – B4 Design & Engineering

Foshan Railway Station

Foshan, China

|

2019

Urban hydraulics

Project

The Guangdong region experienced several major flood events from 2009 to 2015. The floods in June 2015 in Foshan triggered a dynamic shift towards resilience in the approach to urban hydraulics by the Chinese authorities. As part of an architectural competition, B4 D&E, along with Thierry Melot and the IFADUR Agency, contributed to defining a hydraulic approach to the project by distinguishing between four levels of flood risk management.


our missions

Select Urban Hydraulic Expertise


Designer

IFADUR


Client

Municipalité de Foshan​