Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
BOTANY Project – Construction of 30 residential units – B4 Design & Engineering

BOTANY Project – Construction of 30 residential units

Corbas, France

|

2022

VRD Infrastructure

Project

This project involves constructing a building with 30 residential units across two basement levels. The site is located in the municipality of Corbas.


Scope of Reflection

1 500m²​


our missions

DCE | Tender or Bidding Documents

PRODevelopment Design

  • Studies of the connections of the buildings to the existing and projected rainwater and wastewater networks
  • Building platform leveling study
  • Road study including road geometry and suitable road structures
  • Estimated quantities with a detailed price list outlining the VRD (Voirie et Réseaux Divers) interventions per building.