Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Gare ferroviaire de Foshan – B4 Design & Engineering

Gare ferroviaire de Foshan

Foshan, Chine

|

2019

Hydraulique Urbaine

Projet

La région de Guangdong a été sujette sur la période 2009-2015 a de nombreux épisodes d’inondations majeures. Les inondations de Juin 2015 à Foshan ont déclenché une dynamique de prise en compte de la thématique Résilience dans l’approche de l’hydraulique urbaine par les autorités chinoises. De fait, dans le cadre d’un concours d’architecture, B4 D&E a accompagné Thierry Melot et l’Agence IFADUR dans la définition d’une approche hydraulique du projet en distinguant 4 niveaux de gestions du risque inondation.​


nos missions

Expertise hydraulique urbaine


Concepteur

IFADUR


Client

Municipalité de Foshan​