Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Construction d’un bâtiment industriel – B4 Design & Engineering

Construction d’un bâtiment industriel

Kenitra , Maroc

|

2016 – 2017

Infrastructures VRD

Projet

Pour le compte du Groupe Gergonne (équipementier automobile), GBI Morocco a réalisé en conception réalisation un bâtiment industriel de 4500m², extensible jusqu’à 7500m². B4 Design & Engineering a accompagné GBI en réalisant les études de conception des VRD. ​


Périmètre de réflexion

4,500 square meters, expandable to 7,500 square meters (new building construction), Site Design (VRD) for the new building.


nos missions

AVP | Avant-projet

EXE | Etudes d’exécution

PROEtudes de projet

Maitrise d’œuvre VRD et dossier d’exécution sur ce projet de Conception-Réalisation​

Etudes réalisées dans une approche BIM « maquette numérique » ​


Concepteur

GBI Morocco


Client

Groupe Gergonne 


©GBI