Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bintcommtv/www/wp-includes/functions.php on line 6114
Extension du Site EDA BELLIGNAT – B4 Design & Engineering

Extension du Site EDA BELLIGNAT

Bellignat, France

|

2018 – 2021

Infrastructures VRD

Projet

Le projet consiste à mettre à niveau les infrastructures du site existant et d’étendre la capacité Logistique & e-commerce du site EDA de Bellignat. GBI a missionné B4 Design & Engineering pour réaliser les études détaillées de voiries, de réseaux et terrassement/nivellement.​

 


Périmètre de réflexion

35 000m² / Surface de plancher bâtiment:7 500m² de construction neuve bâtiment & 450m² de réhabilitation bâtiment.


nos missions

MOE complèteMaîtrise d’œuvre

  • Etudes des raccordements des bâtiments aux réseaux d’eaux pluviales et d’eaux usées existants et projetés
  • Etude de nivellement des plateformes bâtiments
  • Etude sur la voirie comprenant la géométrie viaire et les structures de chaussées adaptées
  • Quantitatif estimatif avec bordereau des prix détaillant les interventions VRD par zone et par Phase.​

Concepteur

Patrick Roux / MP Architecture​


Client

EDA Industries​